• Legal Status: Section 8 Company • Non-Profit
  • An Initiative Of: Winntus Group (CSR)
Partner With Us
Skip to content
A built-up formwork frame in the storage hall
Module 03

Mobile Practical Lab

Handle tools and components; learn assembly sequence, basic checks, safe working methods and practical site discipline.

Syllabus

What This Module Covers

The mobile practical lab is designed to give students hands-on time with identification and handling of components, connections, and basic assembly.

Outcomes

What You Will Be Able To Do

01

Identification & handling

02

Connections

03

Basic assembly

Formwork in five ideas

How do skyscrapers rise a floor every four days?

  1. Monolithic Casting The core concept
  2. Hardware & Components System breakdown
  3. Science of Striking Safe form removal
  4. Engineering for Safety Calculated precision
  5. High-Speed Cycle 4-day slab cycle

Building knowledge. Building skills. Building construction excellence.

WIFT welcomes colleges, industry professionals, developers, EPC contractors, formwork specialists and institutions.